wastewater treatment equipment

  • Domestic sewage treatment equipment-1

Domestic sewage treatment equipment-1

Choose the appropriate treatment process and related equipment according to the waste water volume and water quality. Ensure that the sewage can be effectively treated to reach the discharge standard, and it can save energy consumption and economic investment.

EMAILEMAIL:frank@zchlsd.com

Domestic sewage treatment solutions

● Choose the appropriate treatment process and related equipment according to the waste water volume and water quality.
● Ensure that the sewage can be effectively treated to reach the discharge standard, and it can save energy consumption and economic investment.

Intelligent integrated sewage treatment equipment
Intelligent integrated sewage treatment equipment
  • Save space: It can be buried below the ground surface, and the ground surface above the equipment can be used as greening or other land without building houses, heating, and insulation.
  • High integration: All process sections and equipment rooms are integrated in the equipment, which is convenient for installation, construction and maintenance.
  • Low mud production: The biochemical tank adopts the biological contact oxidation method, the volume load of the filler is relatively low, the microorganisms are in the self-oxidation stage, and the mud production is small. It only needs more than 3 months (90 days) to discharge the mud (suck or dehydrate it with a manure truck) Biscuit delivery).
  • Simple maintenance: The entire equipment processing system is equipped with a fully automatic electrical control system and equipment failure alarm system, which is safe and reliable in operation. Generally, there is no need for special personnel to manage, only regular maintenance of the equipment.
MEET THE REQUIREMENTS

Holy Shield's domestic sewage treatment plan and equipment can meet the following standards:

"Emission Standard of Pollutants for Urban Sewage Treatment Plants" GB18918-2002
"Integrated Wastewater Discharge Standard" GB8978-1996

According to customer requirements, the design process can meet local standards

Hongli Shengde

Provide personalized sewage solutions for free

And give free high-concentration biological inoculants to speed up the effect of sewage treatment!

  • Customized according to sewage characteristics
  • Customized according to emission standards
  • Customized according to sewage discharge
  • Customized according to the construction site
Holy Shield's products advantages
Small footprint
01

Small footprint

Sewage treatment equipment can be installed on the ground or buried underground. When buried in the ground, the upper cover can be used for greening, with less floor space and fewer ground structures.

Smooth operation
02

Smooth operation, meeting emission standards

Strictly implement various international environmental protection regulations to ensure that the effluent indicators meet the local pollutant discharge standards.

High degree of automation
03

High degree of automation, easy to operate

Automatic control system, temperature setting, automatic temperature control, digital display The product is easy to operate and easy to use.

Free installation and commissioning
04

Free installation and commissioning, lifetime service

We have a mature technical team to provide you with installation and commissioning guidance services, Porvide product service life maintenance service.

One-stop service, give you peace of mind, effort, and money
HONGLI SHENGDE
01

Technical Consultation

To understand water quality discharge requirements in multiple dimensions, to help you perform personalized technical diagnosis, and analyze the reasons why the current water quality exceeds the standard.

HONGLI SHENGDE
02

Construction site exploration

Provide free engineer survey service, and understand the needs and problems of the construction site through remote video.

HONGLI SHENGDE
03

Water quality testing

Your company sends raw water to our factory to conduct a full set of laboratory tests on the raw water and analyze the water quality components.

HONGLI SHENGDE
04

Design process plan

According to the experimental results, the processing process is designed to plan the process flow, which is more in line with individual needs.

HONGLI SHENGDE
05

Customized complete equipment

According to the designed reasonable process, the manufacturer directly customizes the complete set of sewage treatment equipment, which has more stable performance and lower cost.

HONGLI SHENGDE
06

Detailed marking of civil engineering drawing design

Help the construction personnel to be familiar with the equipment installation characteristics, technical quality requirements, and construction techniques to ensure installation accuracy.

HONGLI SHENGDE
07

Equipment installation and debugging

Experienced engineers remotely carry out technical guidance equipment installation and commissioning.

HONGLI SHENGDE
08

Civil Construction Guidance

Remote or video explanation guides civil construction to ensure that it meets the overall sewage treatment needs.