Sewage treatment equipment is the basic condition for the sewage treatment plant to maintain good operating conditions. The quality of its management effect plays a very important role in achieving a higher production management effect for the sewage treatment plant. The editor of
Holy Shield talks to you about the management of
sewage treatment equipment.
1. Personnel Management
In terms of personnel management, the first priority should be to establish a three-level management organization consisting of factory leaders-various departments-front-line management departments to ensure that the various systems established by the processing plant for personnel management are implemented in each department and each person. It is necessary to establish a feedback network for the exchange of equipment management information between the technical department, the maintenance department, and the operation department to ensure that the information is "constantly archived" and "unblocked."
2. Asset management
In the management of equipment assets of sewage treatment plants, the equipment can be divided into different levels for management according to the importance and danger of the equipment. Combining indicator factors such as equipment failure, failure frequency, maintenance cost, etc., separate important equipment such as grille machine, centrifugal blower, lifting pump, mud scraper, etc., and increase the supply of spare parts, maintenance and three-level inspection In terms of investment, the first priority is to ensure the safety and stability of its operation.
3. Maintenance and management
In terms of equipment maintenance, inspection, maintenance, and repair of equipment should be done well. Specifically, three-level inspection, lubrication, preventive maintenance, fault repair, and collaborative repair of equipment should be done.
4.spare parts management
In terms of spare parts management, it is necessary to actively improve the development of spare parts plan-warehouse management-cost tracking analysis-the closed loop construction of spare parts purchase to realize the optimized management of spare parts. Specifically, for large-value spare parts, it is necessary to adhere to the standard procedures of group procurement-arrival and warehousing acceptance-according to the standard procedure of work order receipt; for small-value spare parts in the factory, you can arrange for in-plant purchasers or Engineers make special purchases according to the types of spare parts, and at the same time, they must adhere to the later storage and requisition system.
5. Technical transformation management
Due to the continuous emergence of various new technologies and products for sewage treatment, sewage treatment plants should be modified and improved from time to time according to the actual operating conditions and effects of the equipment. In the process of transformation, the process of determining the transformation plan, preparing for the preliminary technical demonstration, implementing the specific transformation, and checking and accepting the later stage should be strictly followed to ensure that the equipment transformation achieves good results. At the same time, the entire transformation process should maintain the exchange of information with other departments, and carefully listen to the opinions and suggestions of various departments on equipment transformation, so as to prevent the equipment transformation from causing unnecessary impact on actual production.
Holy Shield is a high-tech environmental protection enterprise integrating wastewater treatment production, learning, and research, and has won more than 30 patents. We are now the teaching practice base of Qingdao University of Science and Technology, the scientific research transformation base of the University of Shanghai for Science and Technology and the production, study and research base of Yunnan University.